The Country Club at Golden Nugget

The exacting specifications of a multi-use park or championship golf course can challenge the civil engineering skills of the largest contractors, and here too, HD Truck & Tractor plays in the big leagues.

  • Client: The Golden Nugget Casino
  • Project Type: Golf Course

 

About this Project

The Country Club at Golden Nugget:
Recreational facilities are heavy construction projects too.
The exacting specifications of a multi-use park or championship golf course can challenge the civil engineering skills of the largest contractors, and here too, HD Truck & Tractor plays in the big leagues.

The Golden Nugget Casino’s world class links offer 7,000 yards of tour-worthy fairway designed by Todd Eckenrode and built by HD Truck & Tractor. Set amid acres of gorgeous landscaping and framed by native wetlands, our trusted expertise turned this former municipal dredge site into a Golf Digest Magazine Top Ten new course for 2015 and a showpiece of the Lake Charles waterfront.

Services provided:

  • Clearing and grubbing
  • Soil stabilization and erosion control
  • Mass excavation
  • Embankment
  • Drainage and drain system installation
  • Catch basin creation
  • 40,000 long feet of curb and gutter
  • 616,000 square feet of asphalt and helipad
  • Grassing/landscaping

 

 

    Belfield Drainage

    Belfield DrainageWorking to expand the Belfield Ditch. It consists of increasing the capacity of the ditch that stretched from North Perkins Ferry Road to just east of Belfield Road in Moss Bluff, LA. Date: 12 April 2018 Client: Belfield Developers Project Type:...

    Ditch Drainage Improvements

    Project: Belfield Ditch Drainage Improvements - Moss Bluff, LA To help aleviate flooding near the Belfield area in Moss Bluff, we are installing a 54' long 23' wide aluminum box culvert...16' underground. Normal culverts for a ditch range from 15" - 60". Water should...

    Hydroseeder at West Cal Port.

    Project: West Cal Port With a break in the rain a couple of weeks ago, we were finally able to try out the hydroseeder at West Cal Port.

    Cutting down to grade using Trimble GCSFlex

    Project: Lake Charles College Prep - New Campus Civil Construction Work Heavy Civil Construction

    Email Us

    Contact Us:

    5501 Opelousas Street
    Lake Charles, LA 70615