Belfield Drainage

Working to expand the Belfield Ditch. It consists of increasing the capacity of the ditch that stretched from North Perkins Ferry Road to just east of Belfield Road in Moss Bluff, LA.

  • Client: Belfield Developers
  • Project Type: Drainage

 

About this Project

Excessive flooding in Moss Bluff has been an ongoing problem for residents.

Project: Belfield Ditch Drainage Improvements – Moss Bluff, LA
To help alleviate flooding near the Belfield area in Moss Bluff, we are installed a 54′ long 23′ wide aluminum box culvert…16′ underground. Normal culverts for a ditch range from 15″ – 60″. Water should flow freely in a 23′ culvert!

 

 

    Belfield Drainage

    Belfield DrainageWorking to expand the Belfield Ditch. It consists of increasing the capacity of the ditch that stretched from North Perkins Ferry Road to just east of Belfield Road in Moss Bluff, LA. Date: 12 April 2018 Client: Belfield Developers Project Type:...

    Ditch Drainage Improvements

    Project: Belfield Ditch Drainage Improvements - Moss Bluff, LA To help aleviate flooding near the Belfield area in Moss Bluff, we are installing a 54' long 23' wide aluminum box culvert...16' underground. Normal culverts for a ditch range from 15" - 60". Water should...

    Hydroseeder at West Cal Port.

    Project: West Cal Port With a break in the rain a couple of weeks ago, we were finally able to try out the hydroseeder at West Cal Port.

    Cutting down to grade using Trimble GCSFlex

    Project: Lake Charles College Prep - New Campus Civil Construction Work Heavy Civil Construction