Coach Williams Drive

The Coach Williams Drive Extension  project that includes a new roundabout the first in West Calcasieu. Located at the intersection of Coach Williams Drive and Old Spanish Trail, as well as improvements to Houston River Road. 

  • Clients: Calcasieu Parish Police Jury and Sasol
  • Project Type: Road Construction

 

About this Project

This project was a critical need to reduce traffic congestion and allow local and industrial traffic to flow. It also got rid of the offset intersection which is always a safety problem with competing for turning movements at an intersection. Construction included a new roundabout at the intersection of Coach Williams Drive and Old Spanish Trail, as well as improvements to Houston River Road. 

 

 

    Belfield Drainage

    Belfield DrainageWorking to expand the Belfield Ditch. It consists of increasing the capacity of the ditch that stretched from North Perkins Ferry Road to just east of Belfield Road in Moss Bluff, LA. Date: 12 April 2018 Client: Belfield Developers Project Type:...

    Ditch Drainage Improvements

    Project: Belfield Ditch Drainage Improvements - Moss Bluff, LA To help aleviate flooding near the Belfield area in Moss Bluff, we are installing a 54' long 23' wide aluminum box culvert...16' underground. Normal culverts for a ditch range from 15" - 60". Water should...

    Hydroseeder at West Cal Port.

    Project: West Cal Port With a break in the rain a couple of weeks ago, we were finally able to try out the hydroseeder at West Cal Port.

    Cutting down to grade using Trimble GCSFlex

    Project: Lake Charles College Prep - New Campus Civil Construction Work Heavy Civil Construction

    Email Us

    Contact Us:

    5501 Opelousas Street
    Lake Charles, LA 70615