Ryan Street Reconstruction

Streetscape enhancement projects highlight how HD Truck & Tractor applies expert civil construction and design to bring immediate and lasting improvement to the experience of city life.

  • Client: City Of Lake Charles
  • Project Type: Streetscape enhancement

About this Project

Ryan Street Reconstruction:

The life of a city begins at street level.

Streetscape enhancement projects highlight how HD Truck & Tractor applies expert civil construction and design to bring immediate and lasting improvement to the experience of city life.

The successful Ryan Street corridor reconstruction project exemplifies the scope of work required to create a thriving and beautiful public space. Charged with enhancing pedestrian safety while improving drainage, lighting, signage and aesthetic appeal, HD Truck & Tractor executed a wholesale demolition and reconstruction of this downtown corridor, working around the clock and without causing significant impact to traffic flow or commerce.

Services provided:

  • Removal and salvage of existing traffic and light poles, streetcar tracks, and old signage
  • Improvements to drainage and utility lines and access
  • Erosion control
  • Limestone backfilling
  • Concrete demolition and removal
  • Pre-construction site video
  • Decorative CMU brick paving of sidewalks, intersections, accent strips and squares
  • Driveway and parking lot tie-ins
  • Decorative lighting, signage, benches, trash bins and bike rack installation
  • Sodding and landscaping

    Belfield Drainage

    Belfield DrainageWorking to expand the Belfield Ditch. It consists of increasing the capacity of the ditch that stretched from North Perkins Ferry Road to just east of Belfield Road in Moss Bluff, LA. Date: 12 April 2018 Client: Belfield Developers Project Type:...

    Ditch Drainage Improvements

    Project: Belfield Ditch Drainage Improvements - Moss Bluff, LA To help aleviate flooding near the Belfield area in Moss Bluff, we are installing a 54' long 23' wide aluminum box culvert...16' underground. Normal culverts for a ditch range from 15" - 60". Water should...

    Hydroseeder at West Cal Port.

    Project: West Cal Port With a break in the rain a couple of weeks ago, we were finally able to try out the hydroseeder at West Cal Port.

    Cutting down to grade using Trimble GCSFlex

    Project: Lake Charles College Prep - New Campus Civil Construction Work Heavy Civil Construction

    Email Us

    Contact Us:

    5501 Opelousas Street
    Lake Charles, LA 70615